Flexible solutions for every delivery model.

Improve project outcomes with construction intelligence solutions designed to work seamlessly with your business processes.

Scope Management

Control scope from the first drawing set to the final punch list.

Weaver tracks every design change, addendum, and field deviation against your original scope — so your team always knows what changed, who approved it, and what it means for cost and schedule.

  • Catch unapproved scope additions before they become disputes
  • Reconcile every addendum and ASI before work is built wrong
  • Know which subs have acknowledged the latest scope changes
  • Close out punch items with a complete, documented trail
Workers in high-visibility gear walking along a site hoarding on a live construction project
  • Scope Gap AnalysisCompares historical and current project documents to identify unassigned or excluded scope items before they become change orders or disputes.

  • RFI IdentificationAnalyzes specifications, drawings, and addenda to surface questions that need resolution before work begins, reducing field-level confusion and rework.

  • Specification Conflict DetectionSurfaces contradictions between spec sections, drawings, and contract exhibits that create ambiguity in scope interpretation.

  • Scope Creep QuantificationCompares document revisions across project phases to measure and attribute scope growth, providing the data needed to support change order entitlement.

  • Drawing Change AnalysisCompares drawing sets across revisions to identify added, removed, or modified scope elements that affect cost, schedule, or subcontract scope.

  • Addenda ReconciliationCross-references addenda against base bid documents to ensure all scope modifications were incorporated into the contract and subcontracts.

  • Scope Overlap DetectionIdentifies areas of potential subcontractor scope overlap by comparing bid packages side by side against project drawings and specifications.

  • Pre-Construction Scope ReviewAnalyzes design documents and specifications during preconstruction to surface ambiguities, exclusions, and risk items before work begins.

  • Subcontractor Scope AlignmentCompares subcontract scopes against the prime contract to ensure all required work is included, distributed, and fully accounted for.

Weaver scope review comparing drawing revisions against the original scope

Get started with Weaver Scope Management

Talk to our team about how Weaver can support your program.

Ask Weaver
Capital project intelligence