Scheduling
Keep your schedule on track before delays become change orders.
Weaver continuously monitors your project schedule, surfaces float erosion and critical path risk before deadlines slip, and gives your team the visibility to course-correct while there's still time.
- Spot critical path risk weeks before a deadline is missed
- Prevent delay claims with a documented schedule history
- Know which subcontractors are falling behind before it cascades
- Align your field team and owner on the same schedule picture

Schedule Merge — Combine schedules across projects, campuses, or your full portfolio into a single unified view for executive reporting and cross-project coordination.
Schedule Variance — Compare any two data dates and get auto-generated analysis of critical path changes, float erosion, and milestone drift.
Schedule Integrity — Run customizable integrity checks across your schedules and receive a scored report with prioritized findings.
Schedule Optimization — Leverage historical schedules to benchmark and assess activity durations, resource allocations, and sequencing logic.
Construction Look-Ahead Reports — Auto-generated reports that focus field and construction management teams on near-term critical activities.
Critical Path Analysis — Identifies and visualizes the critical path across your project schedule, surfacing activities with zero float that directly impact completion dates.
Delay Impact Assessment — Quantifies the schedule impact of delays and owner-caused events with activity-level forensic analysis to support claims and change orders.
Float Consumption Tracking — Monitors total and free float across all activities and alerts teams when buffers are being consumed faster than planned.
Baseline Comparison — Compares your current schedule against the original baseline and any approved revisions to track planned vs. actual progress across all milestones.
NV1 Building 1
NV1 Building 1 · Schedule Integrity Report · Jun 24, 2026
The current schedule submission recorded a composite health score of 15.5, a pass rate of 86.1% across 18 checks (15 passed, 1 OK, 2 failed), and 115 high-risk warnings concentrated entirely within a single check category: Relationship Type Validity. The Finish-to-Start (FS) predecessor ratio stands at 89.25%, falling below the required 90.0% threshold across 1,070 checked tasks, with 115 tasks lacking a valid FS predecessor.
The FS ratio of 89.25% falls below the 90.0% threshold — 115 of 1,070 checked tasks lack a valid Finish-to-Start link. Critical milestone tasks including Level 5 IST Complete (MIL-P2-000-1003), MBC Ready For Service (MIL-P2-000-1160), and Level 3 Commissioning Complete (MIL-P2-000-1321) carry FF or SF predecessor relationships instead of FS, weakening schedule logic integrity at program-defining events.
| Risk Finding | Check Category | Severity |
|---|---|---|
| FS Ratio Below Threshold (89.25% vs 90.0%) | Relationship Type Validity | Failed |
| Non-FS Links on Key Milestones (MIL-P2-000-1003, -1160, -1321) | Relationship Type Validity | Failed |
| Finish Milestone Logic — FIN-P2-000-1002 (FF link) | Relationship Type Validity | High Risk |
| Single Warning Category — 115 warnings | Relationship Type Validity | High Risk |
| 2 Failed Checks of 18 Total | Overall Health Score | Score: 15.5 |
Remediate all FF and SF predecessor relationships — convert to FS across the 115 flagged tasks to bring the ratio to or above 90.0%. Prioritize milestone logic corrections on MIL-P2-000-1003, -1160, and -1321. Address finish milestone logic on FIN-P2-000-1002 by converting the FF link to FS to remove ambiguity at project close-out.