Flexible solutions for every delivery model.
Improve project outcomes with construction intelligence solutions designed to work seamlessly with your business processes.
Construction
Give your field team the clarity to build right the first time.
Weaver connects field conditions to project data in real time — surfacing quality issues, workforce gaps, and daily progress deviations before they compound into costly rework or schedule slippage.
- Catch quality issues before they require rework or re-inspection
- Know your workforce and material status before it slows the field
- Keep subcontractor daily reports consistent and complete
- Tie field progress to schedule milestones in one view

Schedule Risk Detection — Monitors open RFIs, unapproved submittals, long-lead procurement, and workforce constraints against the schedule to surface risks before they cause delays.
Pre-Activity Safety Requirements — Tracks the full requirement matrix for high-risk activities — permits, certifications, JSAs — and flags gaps before work begins.
Real-Time Document Access — Gives field and office teams instant access to current-revision drawings, specs, and submittals from any device on the jobsite.
Scope Gap & Conflict Detection — Cross-references contract scope, design documents, and subcontract packages to surface gaps, overlaps, and unassigned work items.
Quality & Non-Conformance Management — Log field observations and deficiencies, assign corrective actions, and track resolution to closure with a full audit trail.
Daily Field Reporting — Capture and aggregate daily reports including manpower by trade, equipment, weather, and work-in-place directly from the field.
Construction Look-Ahead Reports — Auto-generate rolling look-ahead reports tailored to the field — highlighting upcoming activities, resource requirements, and predecessor constraints.
Material & Procurement Tracking — Monitors long-lead procurement against the schedule and flags items at risk of impacting critical path activities before they delay work.
Change Order Impact Analysis — Evaluates proposed change orders against the current schedule and budget to quantify downstream impacts before approval.
2-Week Construction Look-Ahead
PHX-DC-07 · Phoenix Data Center Campus · Week of Jun 23, 2026
Three critical-path activities begin this week: structural steel installation in Hall B, switchgear energization in MER-2, and continuation of above-ceiling MEP rough-in across Floors 2–4. Sequencing risk is elevated in MER-2 — a utility company inspection must clear by June 25 before energization can proceed. Hall B structural steel is the controlling predecessor to roof deck installation, which gates four downstream mechanical equipment lifts.
MEP rough-in on Floors 3–4 is tracking 4 days behind plan following rework on the chilled water distribution piping. Field teams should prioritize spool installation in gridlines C–F to recover schedule before the above-ceiling inspection window closes on July 5. Raised floor installation in MER-2 and generator set commissioning in the yard are the principal Week 2 activities requiring owner coordination.
Week 1 · Jun 23 – Jun 27
| Activity | Trade / Contractor | Start Date | Status |
|---|---|---|---|
| Structural Steel Installation — Hall B | Iron Workers / Turner GC | Jun 23 | On Track |
| Switchgear Energization — MER-2 | Electrical / Siemens Energy | Jun 25 | At Risk |
| Above-Ceiling MEP Rough-In — Floors 2–4 | Mechanical / Limbach Co. | Jun 24 | 4d Behind |
| Raised Access Flooring — Hall A Level 1 | Flooring / Tate Access Floors | Jun 24 | On Track |
| Fire Suppression Rough-In — Floors 1–2 | Fire Protection / Cosco Fire | Jun 25 | On Track |
| Roof Deck Installation — Hall B | Iron Workers / Turner GC | Jun 28 | Predecessor Open |
| IT Infrastructure Rough-In — Hall A | Low Voltage / Anixter | Jun 30 | On Track |
Week 2 · Jun 30 – Jul 7
| Activity | Trade / Contractor | Start Date | Status |
|---|---|---|---|
| Raised Floor Installation — MER-2 | Mechanical / Limbach Co. | Jun 30 | On Track |
| Electrical Conduit Pull — Gridlines C–F | Electrical / Siemens Energy | Jul 1 | On Track |
| Fire Suppression Rough-In — Floors 3–4 | Fire Protection / Cosco Fire | Jul 1 | Float: 2d |
| Concrete Topping Slab — Hall A Level 1 | Concrete / Webcor | Jul 2 | On Track |
| Chilled Water Pressure Test — Hall A | Mechanical / Limbach Co. | Jul 3 | Owner Sign-Off Pending |
| Above-Ceiling Inspection — Floors 3–4 | AHJ / City of Phoenix | Jul 5 | Hard Deadline |
| Generator Set Installation — Yard | Electrical / Cummins | Jul 7 | On Track |
| Crane Mobilization — Hall B Roof | Iron Workers / Turner GC | Jul 8 | Float: 3d |
Open Items Requiring Owner Attention
(1) Utility company inspection for MER-2 energization is scheduled for June 25 — any reschedule pushes energization into the following week and directly impacts IT infrastructure power-on sequencing in Hall A.
(2) Chilled water pressure test results from June 20 are pending owner review; sign-off is required before mechanical commissioning can begin in Hall A. Delay beyond July 3 compresses the above-ceiling inspection window.
(3) Above-ceiling inspection on Floors 3–4 is a hard AHJ deadline on July 5. MEP rough-in must reach inspection-ready status by July 4 to accommodate the city review window. Current 4-day lag requires recovery of at least 2 days in gridlines C–F this week.
(4) Crane mobilization window for Hall B roof is currently set for July 8. Hall B structural steel is the controlling predecessor — any delay beyond 3 days will compress float on the crane window and cascade to four downstream mechanical equipment lifts scheduled through July 14.